7. October 2026

AUMUND GROUP

PREMAS® Case Study: Early Detection Helps Prevent Belt Failure

PREMAS® Case Study Early Detection and Timely Action Prevent Belt Failure Repeated belt drift events detected by PREMAS® 4.0 triggered a timely response, helping to prevent a complete belt failure, unplanned downtime and additional damage. When operating behaviour changes Condition monitoring creates value when changes in equipment behaviour are identified early enough to take action. […]

Read more

30. September 2026

AUMUND Brazil

AUMUND Brazil achieves ISO 9001:2015 certification

AUMUND Brazil, ISO 9001:2015, ISO 9001 certification, quality management, bulk material handling, South America, Brazil, technical support, spare parts

Read more

16. September 2026

Uncategorized, SCHADE Lagertechnik

SCHADE – Reclaimer Conversion Engineering for Cohesive Limestone

SCHADE Case Study From 100 to 600+ t/h: Conversion engineering for cohesive limestone How can an existing non-SCHADE bridge-type reclaimer designed for approximately 600 tonnes per hour achieve its intended capacity when challenging material behaviour limits actual performance to around 100 t/h? A new SCHADE Case Study shows how material investigation, DEM analysis and targeted […]

Read more

1. September 2026

AUMUND GROUP, AUMUND Fördertechnik, SCHADE Lagertechnik, SAMSON Materials Handling

AUMUND Group | Bulk Material Handling for Mining & Minerals

Mining & Minerals Bulk material handling solutions for Indonesia’s growing minerals sector Indonesia continues to invest significantly in the downstream processing of its mineral resources. Alongside nickel, substantial investment is being directed towards copper, bauxite and other mineral commodities. At Mining Indonesia 2026, the AUMUND Group will present technologies from AUMUND Fördertechnik, SCHADE Lagertechnik and […]

Read more

26. August 2026

SCHADE Lagertechnik

SCHADE Stacker for Quarrying Project in Northern Europe

SCHADE Case Study Maximum pre-assembly for a challenging quarry project in Northern Europe How can a large-scale stacking system be engineered to minimise on-site assembly when it first has to travel more than 28,000 kilometres to its destination? A new SCHADE Case Study shows how maximum pre-assembly and transport-optimised engineering were combined for a demanding […]

Read more

13. August 2026

AUMUND GROUP

PREMAS® Inspection: Condition Assessment for Planned Maintenance

PREMAS® Inspection PREMAS® Inspection: From Critical Belt Condition to Planned Maintenance Wear is a natural part of operating bulk material handling equipment. What makes the difference is knowing the condition of critical components early enough to act. A PREMAS® Inspection helped one customer turn a critical belt condition into a planned maintenance decision – with […]

Read more