Apron Feeder Conversion: Extending Equipment Service Life
19. October 2026
Uncategorized, AUMUND CONVERSION

Apron Feeder Conversion: Extending Equipment Service Life
Nearly 50 years in operation – and still going strong. When spare parts for a third-party Apron Feeder at an Italian cement plant were no longer available, the operator initially considered replacing the entire machine. AUMUND Fördertechnik instead developed a comprehensive Conversion solution, combining standard components with tailored engineering to extend equipment service life and secure future spare parts availability.
Project Facts & Details
| Industry | Cement |
| Location | Italy |
| Equipment | Third-party Apron Feeder (BPB) |
| Original installation | 1976 |
| Material | Limestone |
| Specified conveying capacity | 550 t/h |
| Plate width | 1,600 mm |
| Inclination | 20° |
| Specified drive motor | 55 kW |
| Service | Installation and commissioning supervision |
An obsolete machine with no spare parts supplyInstalled in 1976, the Apron Feeder had reached a critical point in its service life. With the original manufacturer no longer in business, essential spare parts were unavailable. Attempts to repair or rebuild the existing gearboxes had delivered limited results. The challenges extended beyond spare parts availability. Extensive wear affected the drive shaft, conveying plates, pins, sprockets and other critical mechanical components, making a comprehensive overhaul necessary. Rather than replacing the entire machine, AUMUND Fördertechnik identified the potential for a comprehensive overhaul while retaining the existing supporting structure. |
Original third-party Apron Feeder before modernisation.
|
Extensive overhaul and installation of AUMUND components.
|
Standard components. Tailored engineering.Close collaboration with the customer was central to developing the right solution. Through on-site measurements, extensive consultation and step-by-step technical coordination, AUMUND established a Conversion concept tailored to the existing installation. With no original construction drawings available, the engineering team had to develop a solution based on the existing installation and its dimensional constraints. The machine underwent a near-complete overhaul, with essentially only the original supporting structure retained. |
Operating in a limestone quarry, the Apron Feeder supplies material to the crusher. The Conversion therefore had to accommodate the existing installation dimensions and interfaces while meeting the specified conveying capacity of 550 t/h. A central engineering challenge was integrating AUMUND standard components instead of individually manufactured replacement parts.
The proposed technical scope included new drive and tension shaft assemblies, D6 crawler undercarriage chains, heavy-duty conveying elements, wear-resistant components, a 55 kW drive and monitoring and emergency-stop equipment.
The resulting solution combined application-specific engineering with standardised components, providing a more dependable basis for future spare parts supply.
From installation to successful commissioningAUMUND Group Field Service supervised installation and commissioning, providing on-site technical support and working closely with the customer throughout implementation. In October 2026, the modernised Apron Feeder successfully completed an initial test run without material, followed by step-by-step testing with limestone. The machine was gradually brought up to 100% operating speed, demonstrating the successful implementation of the Conversion concept. The project demonstrates how technical expertise, customer-focused consultation and collaboration across the AUMUND Group can deliver a cost-effective and resource-efficient alternative to complete machine replacement. |
Modernised Apron Feeder following successful commissioning.
|
Customer Benefits of the Apron Feeder Conversion
| EXTENDED SERVICE LIFE
Comprehensive overhaul of equipment installed in 1976.
|
SPARE PARTS AVAILABILITY
Standard AUMUND components support future maintenance.
|
| EXISTING INSTALLATION
Engineering adapted to the retained structure and available dimensions.
|
REQUIRED CAPACITY
Designed to meet the specified 550 t/h conveying duty.
|
| INTEGRATED FIELD SERVICE
On-site supervision of installation and commissioning.
|
RESOURCE EFFICIENCY
Continued use of the existing supporting structure.
|
|
COMING NEXT · AUMUND GROUP FIELD SERVICE
From Conversion to CommissioningHow does a modernised Apron Feeder perform when put to the test? Discover how AUMUND Group Field Service supported the commissioning process under real operating conditions. What to expect:
|
![]() |
Talk to our Conversion specialists about modernisation opportunities or contact AUMUND Group Field Service for on-site support.
|
AUMUND GROUP CONVERSION
Conversion engineering and equipment modernisation
Email: conversion@aumund.com Telephone: +49 2843 72 270 |
AUMUND GROUP FIELD SERVICE
Installation supervision, commissioning and on-site technical support.
Email: service@aumund-service.com 24/7 Service Hotline: +49 2843 72 458 |
Contact
If we can help you with any further information, please use the contact form to get in touch.
You will receive an immediate automated acknowledgement, and we will respond to your enquiry as soon as possible.
Many thanks
AUMUND. SCHADE. SAMSON.